{"product_id":"santec-ob-long-lead-sinker-fishing-lead","title":"SANTEC - OB LONG LEAD SINKER FISHING LEAD","description":"\u003cp\u003e\u003cstrong\u003eSantec OB Long Lead Sinker Fishing Lead\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eThe Santec OB is a long lead sinker with an elongated, olive-like body — thickest through the middle, tapering away at both ends, with the line passing through the centre. It is the everyday running sinker for bait fishing: slim enough to drop without kiting off, smooth enough that line runs freely when a fish picks the bait up, and long enough that it does not roll around like a ball on uneven bottom. Nine sizes are offered, OL-1 (3g) through OL-9 (80g), so one spread covers everything from a still canal to a deep tidal channel.\u003c\/p\u003e\n\u003ch3\u003eKey Features\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eElongated olive body with a centre through-hole for running rigs\u003c\/li\u003e\n\u003cli\u003eSmooth bore lets line pass freely so a fish feels little resistance\u003c\/li\u003e\n\u003cli\u003eNine sizes, OL-1 (3g) to OL-9 (80g), weight rising with the code\u003c\/li\u003e\n\u003cli\u003ePer-size packs, from 14 pieces in OL-1 down to 3 in OL-9\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eHow To Rig It\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eRunning sinker rig\u003c\/strong\u003e — Thread the OB on the main line, add a bead, tie to a swivel with a 40–100 cm leader below. The lead sits on the bottom and the fish moves off with the bait before it loads up. The core rig for estuary, river and jetty bait fishing.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCarolina style\u003c\/strong\u003e — Same layout with a longer leader and a soft plastic instead of bait. Drag the lead slowly so it kicks up silt and the plastic trails behind.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eChoosing the size\u003c\/strong\u003e — OL-1 (3g) to OL-3 (10g) for shallow, still or slow water and light rods: ponds, canals, sheltered jetties. OL-4 (18g) to OL-6 (35g) for moderate depth, a running tide, or a longer cast. OL-7 (48g) to OL-9 (80g) for deep water, strong current and casting into wind. If the lead creeps downtide, go up one code.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBottom type\u003c\/strong\u003e — The rounded body suits sand, gravel and light weed. Over soft mud keep it moving or it beds in.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eBottom Fishing By Region\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eSoutheast Asia\u003c\/strong\u003e — Mangrove-edge and jetty bottom fishing for barramundi (siakap), mangrove jack, catfish (ikan duri) and grouper; small codes are standard for pond and canal fishing for tilapia and freshwater catfish (ikan keli).\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth America\u003c\/strong\u003e — The classic Carolina rig weight for largemouth bass, plus surf and pier rigs for pompano, whiting and redfish.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eJapan \u0026amp; East Asia\u003c\/strong\u003e — Nage-zuri (投げ釣り) beach rigs for kisu and karei, and dou-tsuki (胴突き仕掛け) dropper rigs from breakwater and boat for kasago and mebaru.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAustralia, Middle East \u0026amp; Europe\u003c\/strong\u003e — Estuary and beach running rigs for bream, whiting, flathead and mulloway; Gulf shore rigs for emperor; European pier fishing for cod, dab and flounder.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cb\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eSpecifications\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003ctable class=\"MsoNormalTable\" border=\"0\" cellpadding=\"0\" width=\"100%\" style=\"width: 100.0%; mso-cellspacing: 1.5pt; mso-yfti-tbllook: 1184;\"\u003e\n\u003cthead\u003e\n\u003ctr style=\"mso-yfti-irow: 0; mso-yfti-firstrow: yes;\"\u003e\n\u003ctd width=\"19%\" style=\"width: 19.92%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cb\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eSize\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"25%\" valign=\"top\" style=\"width: 25.3%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cb\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eWeight\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"32%\" style=\"width: 32.66%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cb\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eQty Per Pack\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"20%\" style=\"width: 20.48%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cb\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eSKU\u003c\/span\u003e\u003c\/b\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr style=\"mso-yfti-irow: 1;\"\u003e\n\u003ctd width=\"19%\" style=\"width: 19.92%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eOL-1\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"25%\" valign=\"top\" style=\"width: 25.3%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e3g\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"32%\" style=\"width: 32.66%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e14 pcs\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"20%\" style=\"width: 20.48%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e*731891\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 2;\"\u003e\n\u003ctd width=\"19%\" style=\"width: 19.92%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eOL-2\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"25%\" valign=\"top\" style=\"width: 25.3%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e6g\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"32%\" style=\"width: 32.66%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e14 pcs\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"20%\" style=\"width: 20.48%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e*731892\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 3;\"\u003e\n\u003ctd width=\"19%\" style=\"width: 19.92%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eOL-3\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"25%\" valign=\"top\" style=\"width: 25.3%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e10g\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"32%\" style=\"width: 32.66%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e13 pcs\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"20%\" style=\"width: 20.48%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e*731893\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 4;\"\u003e\n\u003ctd width=\"19%\" style=\"width: 19.92%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eOL-4\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"25%\" valign=\"top\" style=\"width: 25.3%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e18g\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"32%\" style=\"width: 32.66%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e10 pcs\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"20%\" style=\"width: 20.48%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e*731894\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 5;\"\u003e\n\u003ctd width=\"19%\" style=\"width: 19.92%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eOL-5\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"25%\" valign=\"top\" style=\"width: 25.3%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e23g\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"32%\" style=\"width: 32.66%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e8 pcs\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"20%\" style=\"width: 20.48%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e*731895\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 6;\"\u003e\n\u003ctd width=\"19%\" style=\"width: 19.92%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eOL-6\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"25%\" valign=\"top\" style=\"width: 25.3%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e35g\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"32%\" style=\"width: 32.66%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e6 pcs\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"20%\" style=\"width: 20.48%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e*731896\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 7;\"\u003e\n\u003ctd width=\"19%\" style=\"width: 19.92%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eOL-7\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"25%\" valign=\"top\" style=\"width: 25.3%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e48g\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"32%\" style=\"width: 32.66%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e4 pcs\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"20%\" style=\"width: 20.48%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e*731897\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 8;\"\u003e\n\u003ctd width=\"19%\" style=\"width: 19.92%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eOL-8\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"25%\" valign=\"top\" style=\"width: 25.3%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e70g\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"32%\" style=\"width: 32.66%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e4 pcs\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"20%\" style=\"width: 20.48%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e*731898\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"mso-yfti-irow: 9; mso-yfti-lastrow: yes;\"\u003e\n\u003ctd width=\"19%\" style=\"width: 19.92%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eOL-9\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"25%\" valign=\"top\" style=\"width: 25.3%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e80g\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"32%\" style=\"width: 32.66%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e3 pcs\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003ctd width=\"20%\" style=\"width: 20.48%; padding: .75pt .75pt .75pt .75pt;\"\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003e*731899\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003cp class=\"MsoNormal\" style=\"margin-bottom: 0cm;\"\u003e\u003cspan style=\"mso-ansi-language: EN-US;\"\u003eLead body, through-hole running sinker. Weight rises with the OL code.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch3\u003eRecommended Pairing\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eOL-1 (3g) to OL-3 (10g): light spinning and pond outfits, 6–15 lb main line, 10–20 lb leader\u003c\/li\u003e\n\u003cli\u003eOL-4 (18g) to OL-6 (35g): medium estuary, jetty and bass outfits, 15–30 lb braid, 20–40 lb leader\u003c\/li\u003e\n\u003cli\u003eOL-7 (48g) to OL-9 (80g): heavy surf and deep-water outfits, 30–50 lb braid with a shock leader\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"SANTEC","offers":[{"title":"OL-1 (3g) X 14pcs","offer_id":47520175751339,"sku":"*731891","price":0.6,"currency_code":"USD","in_stock":true},{"title":"OL-2 (6g) X 14pcs","offer_id":47520175784107,"sku":"*731892","price":0.9,"currency_code":"USD","in_stock":true},{"title":"OL-3 (10g) X 13pcs","offer_id":47520175816875,"sku":"*731893","price":1.1,"currency_code":"USD","in_stock":true},{"title":"OL-4 (18g) X 10pcs","offer_id":47520175849643,"sku":"*731894","price":1.4,"currency_code":"USD","in_stock":true},{"title":"OL-5 (23g) X 8pcs","offer_id":47520175882411,"sku":"*731895","price":1.6,"currency_code":"USD","in_stock":true},{"title":"OL-6 (35g) X 6pcs","offer_id":47520175915179,"sku":"*731896","price":1.5,"currency_code":"USD","in_stock":true},{"title":"OL-7 (48g) X 4pcs","offer_id":47520175947947,"sku":"*731897","price":1.6,"currency_code":"USD","in_stock":true},{"title":"OL-8 (70g) X 4pcs","offer_id":47520175980715,"sku":"*731898","price":2.3,"currency_code":"USD","in_stock":true},{"title":"OL-9 (80g) X 3pcs","offer_id":47520176013483,"sku":"*731899","price":1.8,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2644\/5716\/files\/7318_MAIN_SANTEC_OB_LONG_LEAD_SINKER.png?v=1785294070","url":"https:\/\/dcfishing.store\/products\/santec-ob-long-lead-sinker-fishing-lead","provider":"DC FISHING STORE INTERNATIONAL ","version":"1.0","type":"link"}